Company Profile   Client Benefits   Services   Principals   Projects   Employment   Contact Us


D.A. SHIELDS CONSTRUCTION

Planned Parenthood Corporate Offices

 

General Contractor
Project
24,300 s.f 3-story building with underground parking, built in 1967.

Start Date August 2005

Initial scope of work called for demo of existing offices, new space planning,
paint and carpet for all three floors. However, during demo, major structural issues were identified. The building was found to be 400% over-stressed by our structural engineer.

Challenges
  • A decision was made by the client to completely renovate the entire building,
    including all operational systems and the reinforcement of the structure to meet seismic code.
  • The greatly expanded scope had to meet 9-month schedule, as the clients had no flexibility in their lease of temporary space, occupied during construction.
Expanded scope of work
  • Building had to be totally gutted to exterior skin.
  • 7 1/2 tons of steel bracing welded to structure for seismic retrofitting.
  • Footings reinforced
  • Exterior glass facade demomolished
  • New energy efficient glazing installed
  • Completely new mechanical, plumbing and electrical systems installed
  • Elevators renovated
  • Exterior painted and protected with Elastomeric coating
  • 16,500 s.f. parking lot demolished and replaced
  • New landscaping with covered patio and granite water feature, added at building entrance
Results
  • Project completed one week early and under budget.
  • Throughout design and construction, D.A. Shields initiated a strategic plan, which, while maintaining the original design intent, compressed construction schedule and resulted in significant cost savings.
  • Energy saving measures, beat Title 24 by 28.9%-estimated to save the client $65,000 annually.
Project pictures
Finish Date April 2006

Lowest
ULTIMATE
Cost